Friday, March 23, 2012

Traffic Impacts From Public Construction - Week of March 26, 2012

CITY OF MIAMI BEACH PUBLIC CONSTRUCTION-RELATED TRAFFIC ADVISORY
PP-LOGO

Week of Monday, March 26, 2012, to Friday, March 30, 2012
This schedule is subject to change due to inclement weather and/or unforeseen circumstances

SOUTH BEACH
South Pointe Neighborhood
South Pointe Drive, between Alton Road and Ocean Drive
Parts of the roadway will be closed during construction (installing storm water lines and structures, concrete and electrical work)
Collins Court between South Pointe Drive and 2 Street
Sporadic road closures during construction (water line installation and service connections)

Collins Avenue between South Pointe Drive and 4 Street
Parts of the roadway closed during construction (concrete and roadway work) one lane of traffic will be maintained in each direction

Alton Road from South Pointe Drive to 4 Street
Possible lane closures for landscaping work

5 Street from Collins Avenue to West Avenue
Lane closures (up to two westbound and two westbound lanes) from 9 a.m. to 3:30 p.m. Monday – Friday. At least one lane open in each direction at all times. (F-DOT Construction)

MacArthur Causeway
(Port of Miami Tunnel Project)
Eastbound
One right lane closed 9 a.m. – 3:30 p.m. Monday - Friday
One lane closed from west end of MacArthur Causeway Bridge to just east of the bridge 10 p.m. – 5:30 a.m. Monday – Thursday
Two travel lanes will remain open

Westbound
One lane closed 9 a.m. – 3:30 p.m., Monday - Friday
Up to two Lanes closed, 10 p.m. – 5 a.m. Monday – Thursday
One lane will remain open www.portofmiamitunnel.com   

Flamingo Neighborhood
11 Street, just east of Alton Road
Intermittent lane closures Monday – Friday (TECO gas line work)

Collins Avenue from 12 – 14 Streets
Intermittent lane closures from 9 a.m. to 3:30 p.m. Monday – Friday (F-DOT traffic signal installation work)

CITY CENTER
Venetian  Causeway
Eastbound lane closures. One lane open in both directions at all times. Drive carefully.

Collins Avenue @ 17 Street
Intermittent lane closures from 9 a.m. to 3:30 p.m. Monday – Friday (F-DOT road maintenance)

Dade Boulevard from North Michigan Avenue to Meridian Avenue
Construction taking place Monday – Saturday, 8 a.m. – 7 p.m.
All eastbound lanes in this location closed during construction. Traffic on North Michigan Avenue at Dade Boulevard wishing to turn left on to Dade Boulevard will be detoured south to Alton Road, then east on 17 Street, and back to Meridian Avenue. Traffic on North Michigan Avenue at Dade Boulevard, wishing to turn right will not be impacted.

James Avenue between 17 Street and 19 Street Occasional lane closures will occur (minor roadway restoration)

20 Street between Washington Avenue and Collins Avenue Intermittent lane and sidewalk closures, parking restrictions

Collins Avenue from 21 –  23 Streets
One lane closed in each direction from 9 a.m. to 3:30 p.m. Monday – Friday (F-DOT Maintenance work)

MIDDLE BEACH
Sunset Island III & IV
Entrance to Islands
Sporadic lane closures

Sunset Island I
West 28 Street from Lucerne Avenue to North View Drive
Road closed (water main installation)

Lake Pancoast
Flamingo Drive from West 24 Street to West 28 Street
Sporadic road closed (water main installations)

Central Bayshore
Fairgreen Drive from West 28 Street to West 29 Street
Intermittent road closed (water main installations)

Royal Palm Avenue from West 30 Street to 41Street
Sporadic road closed (water main installations)

West 34 Street from Royal Palm Avenue to Chase Avenue
Intermittent road closed (water main installations)

Oceanfront
Indian Creek Drive southbound from 42 to 39 Street
One southbound lane closed through April 27, 2012 (FDOT road maintenance)

41 Street Eastbound between Indian Creek Drive and Collins Avenue
Road closed
Detour: turn south at 41 Street on to Indian Creek, east on 39 Street and north on Collins.

Julia Tuttle Causeway/ SR112/I 1-95
Eastbound lanes between NW 10 Avenue and NE 3 Avenue
Frequent closures 9 p.m. – 5:30 a.m., Monday – Thursday & Saturday Midnight to Sunday 9 a.m.

SINGLE LANE CLOSURES
9 a.m. to 3:30 p.m. - Monday – Friday
9 p.m. to 5:30 a.m. – Monday – Thursday night
Midnight to 9 a.m. – Friday night – Saturday morning
Midnight to 10 a.m. – Saturday night – Sunday morning
Midnight to 5:30 a.m. – Sunday night – Monday morning

DUAL LANE CLOSURES (TRAFFIC MAY BE REDUCED TO ONE LANE ONLY) 
12 a.m. to 5:30 a.m. - Monday through Thursday night
2 a.m. to 6:30 a.m. - Friday night/Saturday morning 
and Saturday night/Sunday morning
2 a.m. to 5:30 a.m. - Sunday night/Monday morning
THRU JULY 2012    www.fdotmiamidade.com

** Southbound lanes on I-95 to Eastbound 112/I-195 Exit
NIGHTTIME CLOSURES
Exit ramp closed 9 p.m. to 5:30 a.m. Monday – Thursday

Collins Avenue between 42 and 58 Street
Northbound lane closed 9 a.m. – 3:30 p.m., Monday – Friday (FDOT Maintenance)

NORTH BEACH
North Shore Neighborhood
Indian Creek Drive and 63 Street
One lane in each direction on 63 Street (northbound, eastbound, westbound) Closed
Monday – Friday, 9:30 a.m. – 3:30 p.m. (F-DOT Maintenance)(Through March 2012)

Harding Avenue, 69 - 71 Streets
Road closed (Public Works installing new sanitary sewer force main)

Dickens Avenue southbound, approaching 73 Street
Southbound lane closed from just north of 73 Street, and past the intersection. Lanes shifted, so there is one lane open southbound.

Dickens Avenue northbound, approaching 73 Street
Lanes shifted, reduced to one lane northbound from 72 to 74 Streets.

73 Street, eastbound, approaching Dickens Avenue
Lanes reduced to one lane just west of Dickens Avenue.

74 Street, between Harding and Collins Avenues
Road closed, construction at Collins Court

John F. Kennedy Causeway
One eastbound and one westbound lane closed Monday – Friday 10 a.m. – 4 p.m.

Biscayne Point Neighborhood
Biscayne Point Island
Sporadic closures (light pole installation)

Stillwater Drive Partial road closures (asphalt roadway repair)